Modern buildings are stunning with superior builds due to the finest construction materials used. Before a beautiful building is built, there are various stages involved in planning and construction. That’s why you need to be guided accordingly to make important decisions when it comes to the requirements you need to prepare in building construction.
In this post, you’ll learn more about the things that happen before a building is actually built.
When it comes to construction planning, the focus includes defining work tasks, choice of technology, and estimating required resources. It also includes setting timeframes for individual tasks and identifying interactions among various work tasks.
A construction plan becomes the basis for budget planning and formulation of the work schedule. Construction plan development is a critical task due to the technical aspects, and organizational decisions should be sound for a successful project.
Make construction jobs safe, easy, and quicker using construction machines or equipment. Before erecting a building, the ground needs to be dug, and heavy equipment is used to dig the earth. Earthmoving equipment shift massive amounts of soil, rocks, and dirt, and dig landscape areas and foundations.
Earthmoving equipment includes compressors, loaders, trenchers, wheeled loading shovels, motor scrapers, bulldozers, backhoes, skid steer loaders, motor graders, and excavators. Excavators are also called diggers, which usually need changes in the tracks and undercarriage parts. When it comes to providing high-quality tracks and undercarriage parts, you have to find a trusted and reliable supplier, such as Fortis Tracks.
Here are the different types of earthmoving equipment and their details:
A good foundation provides support for buildings, houses, and other structures. It involves digging and transferring layers of rock and soil. The engineer and architect will design and develop a suitable foundation plan to take care of soil quality and load requirements. Also, the engineer considers influencing factors, such as seismic, soil settlement, and other local factors during the designing stage.
After the foundation is built, the next step would be wall construction with hollow blocks, red bricks, cement blocks, or laterite. Walls are usually built up to “lintel” level or the top level of windows and doors.
A lintel concrete beam is cast across the building, taking the building load and transferring it to the foundations. The lintel beams are flush-built with the walls, adding structural stability to the building. The “load bearing” structure bears the load of the building where the walls are built on the top portion of the foundation.
The next stage of constructing a building is roof slab casting. It includes providing shuttering to support and hold the concrete cement when poured. A criss-cross framework reinforcement steel is positioned over the shutter before pouring concrete.
The steel provides concrete retaining support, which is a mixture of river sand, cement, blue metal, and special additives. The slab is cured for several days. After the curing period, the first floor walls are raised, and the entire process is repeated.
Before plastering, the routing of plumbing and electrical cables are recommended. It is important to plan the electrical and plumbing points to save time and effort. Also, cut brickwork as necessary.
It is the final stage of constructing a building. The finishing work includes carpentry, electrical and plumbing fittings, tiling, and painting. These tasks can be performed in any order depending on the work progress. Also, putty work for texture painting, smooth finish of the walls, and waterproof painting can be taken up during this stage.
Now you have a clear idea of how a beautiful building is constructed. It starts with creating a detailed plan, using earthmoving equipment to prepare the site, building a good foundation, blockwork and joinery, slab casting, plastering, and finishing work.